Since 5th anniversary of opening, which was August Bank Holiday, Museum has received:

- accreditation by VisitEngland, which involved incognito visits
- accreditation by English Heritage, which involved a lot of checking ' behind the scenes', eg volunteer training and records, safety procedures, etc
- 500th TripAdvisor review; another 5*, leaving the 5* average at 78%

https://www.tripadvisor.co.uk/Attractio ... gland.html

Still running at 20,000+ visitors a year :)
PaulB, Rob P, Korenwolf and 4 others liked this
#1644456
Great result Kanga - I am acutely aware that my inability to visit JAM as yet is a serious omission in my upbringing on my part.

I hang my head in shame.

:shock:
#1666675
In further good news, the steel is now going up on our Phase 2. This will be a restoration and maintenance area (enabling us to bring that work in from a very unsatisfactory outbuilding on a farm), with education rooms above. Our fundraising (nearly all small donations from 1,000s of visitors) has yielded enough, so far, for the floor and walls and roof, but not for fitting out the interior. Still, that has taken us 5 + years since opening; Phase 1, the existing display hangar, took ~30 years. Phase 3, a gleam in the eye only so far but for which the land has already been assigned by the Airport on the far side of Phase 2, will be another full-size display hangar.

First picture of the steel shell:

rikur_, Mike Tango, NickS and 2 others liked this
#1673614
Cladding now up :) . We've been lucky with the weather. Cold including snow was okay, but heavy rain could have delayed things.



Next will be to lay the floor of and leave it to set. Only then can we start moving stuff in under cover. We still need ~£1M to complete the interior ..
Paul_Sengupta liked this
#1694499
Latest landmark: floor of the new hangar has finally been laid. When it is 'cured' we can start moving things under cover. Initially this may be equipment and exhibits from our restoration barn on an irritatingly distant farm. We are still expecting the complete fit out of the new hangar with restoration workshop below and education and viewing area above to cost ~£1M ..